Projects
Natural Technology Systems have been involved in many prestige projects and have contributed to the reduction in greenhouse gas emission by providing companies and individuals with all their renewable energy needs.
Government Projects:
National Parks and Wildlife Service NSW:
New South Wales State Government (Australia)
Northern District comprising Sturt National Park,
Mootwingee National Park and Tarawi Nature Reserve:
Fort Grey Station 90 Km North Tibooburra N.S.W
Contract Awarded to increase system size January 2003
Olive Downs Station 100 km North Tibooburra N.S.W
Mount Wood Station 45 km East Tibooburra N.S.W
Mootwingee National Parks 195 Km North Broken Hill N.S.W
Tarrawee National Park 220 km South Broken Hill N.S.W
Design, supply and installation of five 40 kWh interactive systems
[the largest single contract for Hybrid Power awarded up till then]
Completed 1996
Montague Island
18 Km of the Coast Narooma N.S.W
1 x 65 kW Hybrid Solar Power Systems
120 V DC
Completed 1998
Increased in Size 2002
Green Cape Light House
1 x 65 kW Hybrid Solar Power Systems
Green Cape N.S.W
120 V DC
Completed 1999
Northern Territory National Parks:
Ayers Rock National Park Olgas Camp Ground and Tourist Site Ablution Block Solar lighting and pump system
Composting toilets
Completed 1993
Department of Forestry, Brunei Darussalam:
Supply and installation of hybrid power system using solar, wind and micro hydro as renewable power sources in the National Park in the jungle of Temburong.
South Australian State Office of Energy:
Australian Federal Government and South Australian State Office of Energy remote area demonstration systems:
Design, supply and installation of two 32 kWh interactive systems for station homesteads. The Electricity Trust of South Australia monitored one of the systems for 18 months.

South Australian National Parks:
Dalhousie Springs
350 km North of Coober Pedy
1000 km North of Adelaide
Design Supply Installation
100 kW Containerised Hybrid Solar Wind Power System
Incorporating 2 X 1 kW Wind Turbines 120 V DC
Completed June 200
Seal Bay Visitors Centre Kangaroo Island
50 kW Hybrid Solar Power systems 48 V DC
Completed 2001
Innaminka
45 km North Moomba S.A.
1200 km north of Adelaide
Design Supply Installation
100 kW Containerised Hybrid Solar Wind Power System
Incorporating 2 X 1 kW Wind turbines
120 V DC
Completed June 2002
Coorong National Park
Homestead power system
20 kW Hybrid Solar Wind Power System
Completed 1999
Department of Aboriginal Affairs:
Wataru Out Station Pitinjara Lands
16 kW Solar Array
20 kW Westwind Wind Turbine
Completed April 2005
Natural Technology Systems has had experience working with Aboriginal people on the following projects.
Uluru-Kata Tjuta National Park NT
Mootwingee National Park NSW
Dalhousie Springs National Park SA
Wataru SA
GRID PROJECTS 2000- 2005
South Australian Museum Adelaide – 16 kW PEAK SOLAR
SCHOOLS /GOVERNMENT – 2 kW PEAK SOLAR
Clare High School
Langhorne Creek Primary School
Balaklava High school
Adelaide Swim Centre
Hammra Center
DOMESTIC HOUSE ELECTRIC SYSTEMS
289 Systems with1500 Watt Peak Solar
35 Systems with1000 Watt Peak Solar
DOMESTIC HOUSE ELECTRIC WITH BATTERY BACK UP
15 Systems with1500 - 2800 WATTS PEAK SOLAR
HYBRID Projects 2004-2005
Design, Supply and install of Diesel-Solar Hybrid Power Systems (40 to 80 kw)
10-15-20 KW SINGLE AND THREE PHASE INTERACTIVE INVERTORS
2880 WATTS – 6120 WATTS SOLAR ARRAY
120 VOLT 1600 AMP/HR BATTERY BANK
Mungerannie Station SA
Epsilon Station Qld
Oriento’s Station Qld
Tickalar Station Qld
Bollards Lagoon Station Cameron’s Corner SA/Qld Border
Melton Station SA
Maynard’s Well Station SA
Arther Downs SA
Oratunga Station SA
Domestic /Rural hybrid Household power systems
25 Systems 10kw Solar Hybrid House System
HYBRID Projects 2003
Design, Supply and install of Diesel-Solar Hybrid Power Systems (40 to 80 kw)
10-15 KW SINGLE PHASE INTERACTIVE INVERTORS
2880 WATTS – 6120 WATTS SOLAR ARRAY
120 VOLT 1600 AMP/HR BATTERY BANK
Kokath Station SA
Mt Vivian Station SA
Bindarrah Station SA
Commonwealth Hill Station SA
Plumbago Station
Kalabity Station
Domestic /Rural hybrid Household power systems
35 Systems 10kw Solar Hybrid House System
HYBRID Projects 2002
Design, Supply and install of Diesel-Solar Hybrid Power Systems (40 to 80 kw)
10-15 KW SINGLE PHASE INTERACTIVE INVERTORS
2880 WATTS – 6120 WATTS SOLAR ARRAY
120 VOLT 1600 AMP/HR BATTERY BANK
Plumbago Station SA
Callana Station SA
Mahonwe Station SA
Yalymboo Station SA
Bon Bon Station
Domestic /Rural hybrid Household power systems
38 Systems 10 kW Solar Hybrid House System
HYBRID Projects 2001
Design, Supply and Install of Diesel-Solar Hybrid Power Systems (30 to 50 kw)
5-10-15 kW SINGLE PHASE INTERACTIVE INVERTORS
2880 WATTS – 6120 WATTS SOLAR ARRAY
120 VOLT 1600 AMP/HR AND 48 VOLT AMP/HRS BATTERY BANK
48 VOLT 1100 AMP/HRS
Parakylia Station
South Gap Station
Flinders Rangers SA
Gum Creek Station SA
Moo Loo Loo Station SA
Maynard’s Well Station SA
Willow Springs Station SA
Wirrealpa Station SA
Finders Island SA
34 km of the Coast of Elliston SA
750 km west of Adelaide
2 x 50 kW Hybrid Wind Power System
Incorporating 2 x 3 kW Wind Turbines
Eber Anchorage Streaky Bay SA
850 km west of Adelaide
2 x 20 kW Hybrid Solar Wind Systems with 1 kW Wind Turbines
2 x 25 kW Hybrid Solar Wind Power System with 3 kW Wind Turbines
2 x 20 kW Hybrid Solar House power System
Kangaroo Island SA
1 x 40 kW Hybrid Wind Solar Systems with 3 kW Wind Turbine
4 x 5 kW Hybrid Solar Power Systems
Domestic /Rural hybrid Household power systems
8 Systems 10 kW Solar Hybrid House System